Scope of Work:
Relocation of two double wide trailers to a new location one block away from their current location on Rockland Key, Both trailer units will need to be jacked up and have disconnections of all of the utilities before moving the units. Contractor is to re-install the wheels and tongue in order to move the units to the new location one block away. Contractor will relocate all of the equipment with the double wide, all of the stairs and ramps to be moved with unit to the new site one block away, and one generator to be relocated with trailer. Both units will need to be elevated per-code at the new site with all utilities reconnected. Sewer, water and electric reconnections must be done at the new location
|